Sargent Metal recently began generating clean energy with the addition of a 609.4 kilowatt (kW) solar array atop their facility in Anderson, SC. The system, installed by Hannah Solar,...

Back to Projects

Project Description

Sargent Metal recently began generating clean energy with the addition of a 609.4 kilowatt (kW) solar array atop their facility in Anderson, SC. The system, installed by Hannah Solar, will produce an offset of 26.7% of the annual energy consumption of 3,192,357 kWh.

Sargent Metals had considered solar opportunities previously but decided that the payback period was too long for investment. With the Duke Energy $1 per watt rebate incentive, the solar investment was recaptured in the first year. Hannah Solar managed the application process for the 609 KW system and achieved a $609,000 rebate for Sargent Metals. The completed solar array powers approximately 26.7% of the annual electricity need for this metal fabricator, a savings of $60,000 annually on their utility bill.